3000kg condensing diesel oil steam boilers in Bekasi

Recently, the Government Office of Hebei Province issued the "Hebei province coal investment projects coal alternative management approach", mainly to strengthen air pollution control, the implementation of total coal consumption control target. The new "management approach" referred to new construction, renovation, expansion project of coal, coal should carry out the same amount of reduction or substitution (hereinafter referred to as a substitute for coal). Coal substitute coal should be completed before the project goes into operation.

These measures apply to administrative areas in Hebei coal for direct consumption of fixed asset investment projects. It refers to the direct consumption of coal raw coal, washed coal, other coal washing, coal slurry, coal, coal and other raw materials or fuels production and processing or combustion, its coal facilities (facilities, tools) including boilers, furnaces , gasification, blast furnace and so on.

Coal alternative pathway includes the following four aspects: the elimination of backward production capacity, excess capacity and Yajian enterprises closed down, converting reduce coal consumption; the implementation of central heating, reduce coal consumption saving technological transformation or removal of equipment out of coal-fired boilers and other equipment coal consumption; use of renewable energy, natural gas, electricity and other clean energy alternative to coal consumption; the other to meet the requirements of coal consumption reduction approach. Replacement of coal coal project supervision and management, energy conservation authorities responsible for co-ordination at all levels.

Improve the thermal efficiency of gas 3000kg condensing diesel steam boilers in bekasi, to reduce the scale of the heating surface regardless prevention, gas steam boiler after a long run, it will produce some more or less scale. Gas steam boiler in operation, the furnace will be a series of chemical and physical reactions, in use, will form a hard and dense scale on the heating surface, which will directly result in reduced heat transfer efficiency of the boiler; and by corrosive effects of scale, will lead to reduced water wall furnace heat absorption gas steam boilers, which reduces thermal efficiency, waste input costs. The need to clean up the scale there is little that the boiler is to make long-term stable operation down. Scale thermal conductivity of only one percent of the steel, once the heating surface fouling, so that the heat transfer will be impeded, during use in order to maintain a constant output of the boiler, it is necessary to increase the temperature of the fire side. The outlet temperature of the furnace gas steam boiler is increased during the process, so that it will lose gas steam boiler is increased, so that effective heat transfer will reduce the equipment fouling in the water wall, so it is very likely It can cause water wall tube wall temperature increases lead to burst pipes water wall. Cleaning the boiler becomes particularly important. Performing the cleaning process, you can use efficient, environmentally friendly and non-corrosive cleaning agent, so that the device will be exposed to the original metallic tube, reduced to fouling. Secondly, after ignition gas steam boiler, flue gas temperature of the furnace needed to observe changes and the main steam temperature; when the main steam pressure is on the rise, if the boiler ignition, the smoke temperature rise speed or does not rise significantly Pianman, immediately check the oil on fire the gun.

Electric 3000kg condensing diesel steam boilers in bekasi before use Preparation 1, the operator must understand how the present electric steam boiler, location, performance and working methods of the various accessories. 2, check oil combustion, and each nozzle connection, power supply and the burner, the pump, the boiler installation accessory. 3, clearly the main steam valve open, after closing the normal close it. 4, check the electric steam boiler water level, water level confirmation flexible, normal position. 5, the pressure regulator is properly tuned, regulate combustion damper.

What are the precautions in the loading and installation of gas-fired 3000kg condensing diesel steam boilers in bekasis?

Gas-fired steam boilers are a very wide range of special equipments, widely used in food, chemical, paper, textile, construction and other industries. In the process of loading and installing a gas steam boiler, some problems must be paid attention, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

5. The fire resistance grade and fire protection requirements of the boiler house building shall comply with the requirements of the Code for Fire Protection of Building Design and the Code for Fire Protection Design of High-rise Civil Buildings. The ground of the gas steam boiler room should be flat, non-flammable, no water accumulation, and the foundation load should meet the requirements. The power supply voltage of the gas steam boiler room should be stable to avoid causing the electrical components to burn out. If the voltage is unstable, it is recommended to install a voltage regulator. Ventilation equipment should be installed in the boiler room, and the boiler should be kept at room temperature below 50 °.

3000kg condensing diesel oil steam boilers in Bekasi Related Information

Diesel Oil Boilers To Heat Up Closed Radiator System

Diesel Oil Boilers To Heat Up Closed Radiator System Central Heating Systems And Services Euro Plumbi A closed system, where the system is not open vented but deals with expansion by means of an air bladder expansion tank, and over pressure by means of a relief valve.

Get a Quote

Related Information

DO YOU HAVE QUESTIONS? WE ARE HERE TO HELP YOU!